Map
Listed price in listed location currency (USD).
$435,000

322

MLS® 2253338

Overview

Key Facts

Type Single Family Residence
Levels Residential
Size 2097 sqft
Garage Yes
Taxes 
Days Active 30
Lot Size 
Approx. Age 2026
Avg. Price Per Sqft $207
MLS® Number 2253338

Property Address: 132 Buffalo Ridge Rd, Giddings, TX, 78942-1412

Average square foot calculated using Size range provided by listing agent.

Description

Welcome to this beautiful new construction home, scheduled to be move-in ready in less than 45 days! Offering just under 2, 100 square feet of thoughtfully designed living space, this custom-built home combines quality craftsmanship with modern comfort. Inside, you’ll find 3 spacious bedrooms and 2 bathrooms, along with a versatile bonus room perfect for a home office, playroom, or flex space to fit your needs. The open layout is filled with natural light, highlighted by large windows that create a bright and inviting atmosphere throughout. The primary suite is designed with convenience in mind, featuring a laundry room with direct access from the primary closet, making everyday living that much easier. Step outside to a beautiful covered back porch with soaring ceilings, perfect for relaxing or entertaining. The kitchen comes fully equipped as an added bonus, featuring all appliances including a refrigerator/freezer, dishwasher, gas range, and microwave, making this home truly move-in ready. The garage offers more than just parking, with a dedicated workshop area ideal for hobbies or extra storage. Located in the desirable Buffalo Ridge Subdivision, this home will also include a sprinkler system and gutters for added ease and functionality. Don’t miss the opportunity to own this stunning new home with high-end custom details, ready for you very soon!
MLS® Number2253338
Laundry LevelEnsuite
Central VacNo
FireplaceNo
Acreage
Exterior
GarageYes
Approx. Age2026
Basement
DrivewayDriveway, Garage Faces Front, Garage, Off Street
Garage Spaces
Heat
A/C
Heating Fuel

Extras

Price History

-End Date
Not Sold YetSold Price

For Sale

Apr 29, 2026List Date
$435,000List Price

Map

Like what you see?

Complete the form and we'll be in touch. No login necessary.

Add a Comment
Loading...

Similar Listings

Comparable Properties